1MW Generator Turbine

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2019-11-21 00:56

  • Browse the number:

    56

Send an inquiries

Company Profile

Hongya Power Generating Equipment to Utilities Limited

By certification [File Integrity]

Contact:hongyalida(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.chinawaterturbine.com/ http://hongyalida.nhdikang.com/

Product details

Water turbines may depend on the impulse of the working fluid on the turbine blades or the reaction between the working fluid and the blades to turn the turbine shaft which in turn drives the generator. Several different families of turbines have been developed to optimise performance for particular water supply conditions.In general, the turbine converts the kinetic energy of the working fluid, in this case water, into rotational motion of the turbine shaft.


 Introduction

Capacity 50KW-10MW per unit

Excitation: brushless or thyristor

Water head: 5m-1000m

Runner material: stainless steel

Shaft arrangement: vertical or horizontal

Warranty: 12 months after commissioning

 

Advantages

Our portfolio of solutions for hydropower generation includes the broadest range of hydro solutions and services: from water to wire, from individual equipment to complete turnkey solutions, for new plants and the installed base.Our plant integrator approach for small hydropower is based on our expertise and ability to combine machines and auxiliary services with simplified interfaces. Our standardized small hydropower solutions benefit from our experience in design.

 

FAQ

Q1,Q: Are you trading company or manufacturer ?

We are a manufacturer

Q2: How many years' manufacturing experience do you have?
A: 20 years' experience in the hydropower manufacturing field and provided services for more than 1000 hydropower stations.
A: We are factory professionally making water turbine, water turbine generator and units,valves,for hydropower station.

Q3,how about delivery time?

6 months after confirm technical specification

 


http://www.chinawaterturbine.com/